Loss waterfallSample data, fictional sites

Portfolio loss waterfall

came in against its budget at actual weather . Losses took of expected energy, is unexplained, and sits with no contractual owner.

Net budget (P50)

Metered against it

Budget at actual weather

Weather

Metered export

against budget at actual weather

Total losses

Expected energy less metered

Unexplained

Not accounted for by any loss

Data completeness

Weighted by expected energy

From budget to metered export

Each loss bar shows the result against the allowance in the budget. Up is better than budget, down is worse. Click a bar to see what is inside it.

The value axis starts above zero so the loss bars stay readable; total bars carry a break mark where they are cut. Source: fictional sample portfolio, January to October 2026.

Inside

Allowed ·Actual ·Against allowance

Items and owners

Source: fictional sample portfolio, January to October 2026.

Who owns the loss

Each loss item mapped to the party or contract that carries it. Paid curtailment is energy the site was compensated for.

  • Owned by a party or contract
  • No contractual owner
  • Unknown (unexplained)

Source: fictional sample portfolio, January to October 2026.

Losses by month

Every loss category, month by month, with the total the budget allowed marked on each bar. Click a month to set the period, and click it again to go back to the year to date. Click a category in the key to open it.

Source: fictional sample portfolio, January to October 2026.

Sites

Sorted by result against budget at actual weather, worst first. Click a row to drill into the site. A large unexplained share usually travels with poor data completeness.

Site Technology Capacity (MW) Budget at actual weather (MWh) Metered (MWh) Against budget Losses Unexplained Data completeness Yield (kWh/kW)

Source: fictional sample portfolio, January to October 2026.

Method, definitions and sample data
Net budget (P50)
The P50 energy budget after the losses it allows for in each category. In this sample it is the gross P50 yield less each category's allowance.
Weather
The change in budget caused by the weather actually measured on site. It is not an operational loss, so it is shown in grey.
Budget at actual weather
The net budget re-run at measured conditions. This is the fair target for the period, and the starting point for judging operations.
Allowance and result
Each category's allowance is the share of expected energy the budget assumed it would lose. The bar is allowance less actual loss, so up means better than budget.
Expected energy
The yield model at measured conditions before any losses, used in the absolute losses view. Solar uses plane of array irradiance and module temperature, before the inverter AC limit, in line with IEC 61724-1. Wind uses measured free-stream wind speed through the warranted power curve, corrected for air density.
Design and weather
Wake, clipping, inverter thermal derating, row shading, snow, icing and high wind hysteresis. Set by layout, equipment choice and climate rather than by operations, so shown in grey.
Grid and curtailment
Network outages and operator instructions, split into paid and unpaid.
Set point and export limit
Energy held back by the power plant controller beyond what the grid actually asked for. These losses usually sit with nobody, which is why they persist.
Balance of plant
ACB trips, protection relay trips (G99 in the UK), transformer derating and HV faults.
Equipment availability
Inverters, trackers, strings and turbines offline.
Performance
Losses operations can act on. For solar: soiling, degradation above the warranted rate and module underperformance. For wind: power curve underperformance and yaw misalignment.
Unexplained
Expected energy, less every counted loss, less metered export. The budget allows nothing for it. Keeping it small and honest is the real test of the data.
Counting each MWh once
Where causes overlap, the lost MWh goes to the first bar that applies, working left to right. The sample data does not model overlaps. A real build has to, using the same exclusion rules as the O&M contract.
Percentages
Every percentage is a share of expected energy before losses, so the bars add up.
Value view
Each MWh valued at the site's tariff. This is the value of the energy, not lost revenue: paid curtailment was compensated, so it cost the site nothing, and merchant sites earn the price at the time rather than a flat tariff. Paid curtailment stays in so the bridge closes, and the owner chart marks it as paid.
Largest shortfall
The single site and category furthest below its budget allowance for the selected view and period, ranked on energy. It carries the spark in the waterfall.
Data completeness
The share of intervals with a valid reading from the revenue meter, inverters and weather station, weighted by expected energy.

Sample data. The five sites, their names, tariffs, allowances and every number on this page are fictional, generated to show how the waterfall behaves.